2020-04-17
Reference in power plant
Gas engine type: 16V150LTD
1038KW/1500rpm
Genset brand:Waukesha
Original T/C: TPS48-F32
New T/C: TET181
Date putting in use: 2016.01.26
Client:A Landfill power plant in Chongqing
After T/C retrofit, performance of T/C has met with original requirement of FAT.
Reference 1
Gas engine type: TCG 2020 V20
1750KW/1500rpm
Genset brand :MWM
Original T/C : TPS48-F32
New T/C :TET181
Date putting in use: 2016.02.27
Client:A coalbed methane power plant in Shanxi
Reference 2
Gas engine type: TCG 2020 V20
2052KW/1500rpm
Genset brand :MWM
Original T/C : TPS48-F32
New T/C :TET181
Date putting in use: 2017.07.30
Client:A coalbed methane power plant in Shanxi
Time | 7.29 17:16 | Cylinder Temp °C | |
Load KW | 1800 | A1 | 347 |
Gas concentration % | 36.8 | A2 | 357 |
Mixing gas opening | -292 | A3 | 369 |
Inlet air temperature ° C | 29.4 | A4 | 327 |
Receiver temperature ° C | 57.5 | A5 | 368 |
Ambient temperature ° C |
| A6 | 333 |
Bearing temperature ° C | 38.8\33.8 | A7 | 358 |
Oil temperature ° C | 91.4 | A8 | 347 |
Oil pressure bar | 6.32 | A9 | 398 |
T/C rotating speed 1 / s | 893\915 | A10 | 373 |
Throttle valve opening% | 76.3\74.9 | B1 | 392 |
T/C outlet pressure mbar |
| B2 | 378 |
Pressure after throttle valve mbar |
| B3 | 364 |
Average cylinder temperature ° C | 366 | B4 | 347 |
Cylinder Liner water inlet temperature ° C | 80.5 | B5 | 383 |
Cylinder Liner water outlet temperature ° C | 92.4 | B6 | 331 |
Intercooled water inlet temperature ° C | 42.9 | B7 | 390 |
Intercooled water outlet temperature ° C | 43.5 | B8 | 400 |
Head vibration (1 # point) |
| B9 | 413 |
Vibration at the tail (8 # points) |
| B10 | 375 |
Crankcase pressure mbar | -2.4~2.0 |
Reference 3
40 sets of TET 181 for CNPC Jicai Power company Limited
Reference 4
Gas engine type: J320 GS C21
1095KW/1500rpm
Original T/C : TPS52-F32
New T/C :TET 211
Date putting in use: 2016.07.03
Client:A garbage landfill power plant in Guangzhou
Reference 5
Gas engine type: JMS 620 GS SL
Output: 3119 KW
Rotating speed: 1500 rpm
Original T/C : NR20S
New T/C :TET 261
Date putting in use: 2016.08.01
Client:A coalbed methane power plant in Shanxi
Reference 6
Turbocharger retrofit for South America power station
ABB TPR61-F turbocharger helps stabilise locomotives on the plateau
Brand Association
◆ Super & Best: Super robust, best fit to your engine
◆ Value: Devotes to supply affordable high quality T/C